Modernize the platform. Preserve the evidence.

Establish what exists, design the target, and validate the result before retiring the old path. The archive, its context and its dependent applications all belong in the migration plan.

Conceptual data flow5 connected layers Select a layer to inspect
  1. Current state 01 Existing estateInterfaces · archives · consumersExplore layer
  2. Transition planning 02 Migration designTarget topology · recovery planExplore layer
  3. Asset context 03 Context mappingTags · identities · AF modelsExplore layer
  4. Validation 04 Transfer & validationHistory · checks · reconciliationExplore layer
  5. Future state 05 Cutover & ownershipConsumers · acceptance · supportExplore layer

Layer 3 of 5 · Context mapping

↑ Back to the diagramAsset context

Context mapping

Map source identifiers, units, security and asset relationships deliberately. Preserve meaning as well as values, and document transformations that change how a consumer interprets the record.

Explore the related service
Receives
Source identities, asset models and dependent calculations.
Delivers
A controlled mapping for data, metadata and consumers.
Connection to plan
Review naming collisions, renamed assets, time zones and version differences before copying at scale.
Security, quality and ownership span every layer.

Cutover is a reviewed operational change. Keep a documented rollback path and an agreed coexistence period; timing depends on the source, target and production constraints.

The intended outcome

A controlled transition with evidence that history, context and critical consumers still work.

Discuss your architecture
Read the complete architecture as text
  1. Existing estate

    Inventory archives, collection paths, security dependencies and the applications that consume the data. Include informal spreadsheets and specialist tools that may not appear in a system diagram.

    Receives
    Configuration, archive inventory and stakeholder requirements.
    Delivers
    A dependency map and an agreed migration scope.
    Connection to plan
    Confirm retention obligations, source access and the recovery position before selecting a migration method.
  2. Migration design

    Design the target against capacity, availability, recovery and support requirements. Hosting can remain on premises or move to an appropriate cloud environment; the choice does not remove operational obligations.

    Receives
    Baseline evidence, requirements and target constraints.
    Delivers
    A reviewed target design, migration sequence and rollback criteria.
    Connection to plan
    Plan coexistence, licensing, maintenance windows and the order in which interfaces and consumers move.
  3. Context mapping

    Map source identifiers, units, security and asset relationships deliberately. Preserve meaning as well as values, and document transformations that change how a consumer interprets the record.

    Receives
    Source identities, asset models and dependent calculations.
    Delivers
    A controlled mapping for data, metadata and consumers.
    Connection to plan
    Review naming collisions, renamed assets, time zones and version differences before copying at scale.
  4. Transfer & validation

    Use migration tools and methods appropriate to the source and target versions. Reconcile representative values, timestamps, quality and retrieval behaviour; successful file transfer alone is not acceptance.

    Receives
    Approved mappings, source history and target configuration.
    Delivers
    Transferred data plus recorded reconciliation evidence.
    Connection to plan
    Test gaps, boundary periods, event context and critical queries; resolve discrepancies against agreed tolerances.
  5. Cutover & ownership

    Prove critical displays, reports and integrations against the target, then execute the approved transition. Hand over recovery procedures, monitoring and ownership before retiring the legacy path.

    Receives
    Validated target, consumer test results and cutover approval.
    Delivers
    An accepted operational service with an accountable support model.
    Connection to plan
    Confirm user acceptance, post-cutover checks and the conditions for ending rollback availability.

Modernize deliberately. Preserve what the operation depends on.

A historian upgrade or migration affects more than an archive. Collection interfaces, asset models, security, displays, reports and informal analytical tools can all depend on the existing environment. We make those dependencies visible before shaping the target and the transition plan.

Our approach combines an agreed baseline with controlled mapping, representative reconciliation and documented acceptance criteria. Coexistence, recovery, cutover responsibilities and post-transition support are considered together, so the new environment can be accepted on evidence rather than on the completion of a transfer alone.